Innovative Technology


No No. of Road Total length
in KM
R&D Length Type Year of Sanction Completion Status as per OMMAS
1
2 7.4 1.2 Cold Mix 2011-12 Completed
6 13.4 11.7 Lime Stabilization, RCCP, Fly Ash, Waste plastic 2012-13 All Completed
24 84.65 76.55 Cold Mix, RCCP, Fly Ash, RBI 81 2013-14 All Completed
121 520.01 419.78 Cold Mix, RCCP, Cell Filled, panelled concrete, waste plastic, nanotechnology, terrazyme 2016-17 69 Completed
52 in progress
137 1738.6 1171.1 Cell filled, Cold Mix, fly ash, Iron slag, Panelled CC, RCCP, Waste Plastic, White topping 2017-18 (PMGSY-II) 15 completed, 122 in progress
188 990.19 986.26 Cell filled, cement stabilization, cold mix, RCCP, Terrazyme, waste plastic 2018-19 6 completed
Total 478 3354.25 2672.62